Project Summary
IEC UAE designed and executed a combined fresh air ventilation and cooling system for RAK Porcelain's production and warehouse facility in Ras Al Khaimah. The scope brought together a Fresh Air Handling Unit (FAHU) with heat recovery and a VRF air-conditioning system — delivering continuous filtered fresh air, controlled extraction of odour-laden air, stable temperature, and managed humidity across the working areas.
Client Overview
RAK Porcelain is one of the world's leading manufacturers of professional-grade porcelain tableware for the international HORECA industry, operating a large-scale production and warehousing facility in Ras Al Khaimah. Their operation demands consistent indoor conditions — clean air for staff, controlled humidity for product decoration and printing quality, and stable temperatures across large open production and storage volumes.
Scope of Work IEC UAE Delivered Complete Ventilation & HVAC Execution, Including
IEC UAE handled the full mechanical package from design coordination through commissioning:
- ✅ Supply and installation of FAHU with integrated heat recovery section
- ✅ Fresh air intake, filtration and treatment system
- ✅ Extraction system for removal of stale and odour-laden air
- ✅ Supply and installation of VRF indoor and outdoor units
- ✅ Hard-drawn copper refrigerant piping with closed-cell insulation
- ✅ Ducting, air distribution and diffuser layout across production and storage areas
- ✅ Airflow balancing to maintain positive pressure and consistent air change rates
- ✅ Complete testing, commissioning and performance verification
- ✅ Execution phased around live production schedules with minimal downtime
Technologies & Equipment Used
- Fresh Air Handling Unit (FAHU)
- Heat Recovery Unit / Energy Recovery Section
- VRF Indoor Units
- VRF Outdoor Units
- Exhaust Air System
- Hard-Drawn Copper Refrigerant Piping
- Insulated Ducting & Air Distribution Network
- Filtration & Humidity Control
Project Challenges
Our Solution
IEC UAE engineered an integrated fresh air and cooling strategy rather than treating ventilation and air-conditioning as separate systems.
Our approach included:
Results / Outcome 🏆
Clean, Odour-Free Air
Continuous fresh air supply with controlled extraction eliminated odour build-up across production and warehouse areas
Controlled Humidity
Stable moisture levels supporting consistent porcelain decoration and printing quality
Reduced Power Consumption
Heat recovery lowered the cooling load on incoming fresh air, cutting operational energy cost
Improved Working Environment
Comfortable, consistently cooled conditions for staff across large open production and storage volumes